Addition and boring bar foundation, completed in December 2008. Addition: 60' x 244' x 31'-6" with (2) 30-ton cranes and (1) 5-ton auxiliary crane. Boring bar foundation: excavated foundation 9' deep requiring over (300) cubic yards of formed concrete with more than (15) tons of reinforcing steel and (154) anchor bolts.